Take it, skip it, or do it after closing?
Send us your builder's design center options with prices. A specialist goes through every upgrade before your deadline and tells you what to take from the builder, what to skip, and what to do cheaper after closing, with the savings in dollars.
What you get
- A verdict on every line of your options list: take from the builder, negotiate, skip, or do after closing.
- The savings in dollars for each upgrade you can do cheaper after closing, at local market prices.
- What can't wait. Structural and in-wall options (rough-ins, electrical, low-voltage, structural changes) and the deadlines your builder sets for them.
- An after-closing plan: what to buy where, in which order, and which local stores to visit, so you shop several stores in one plan instead of starting over at each.
- Your own contractors, side by side: invite the flooring installer or cabinet maker you already know by email. They see your home in 3D with the options you picked, and their quote lands next to the design center price. They don't need an account and pay nothing.
How it works
- Send your options list. The price sheet or selections summary from your builder; a photo of it works.
- A specialist reviews it. Not just an AI scan: a person who knows design center pricing checks every line against local prices.
- You get the report before your deadline, with what to tell the design center and what to keep for after closing.
Launching soon
$199 one-time · founding price
- Pay nothing now: join the waitlist and we email you when it opens
- Your founding price stays the same when we launch
- Tell us your builder and metro area, and we open there first
Questions
Which upgrades should I take from the builder?
Anything structural or inside walls, floors and ceilings: rough-in plumbing, extra electrical and recessed lighting, low-voltage wiring, gas stub-outs and structural options. These are costly or disruptive to add later. More in are builder upgrades worth it?
When should I get the check?
Before your design center appointment, or at the latest before the builder's deadline for options. Some builders set an earlier deadline for structural options than for finishes, so ask your builder for both dates.
Can my own contractor quote on it?
Yes. Invite any company by email. They see your floor plan and the options you picked, and their quote shows up next to the builder's design center price. You decide per company what they can see.
Is this the same as the free AI check?
No. The free AI check flags obvious overpricing in seconds. The Upgrade Check is a full review by a specialist, with the after-closing plan and local prices.
Do I pay now?
No. Join the waitlist and we email you when it opens, at the founding price you saw on this page.